Skip links and keyboard navigation

The Right to Information Act 2009 (PDF icon 1 MB) (RTI Act) commenced on 1 July 2009. The department will make information available as released under the act that is of significant interest to the wider public. This information is identified in our disclosure log. The disclosure log contains information released since 1 July 2009 and does not identify all information released under Right to Information.

New obligations for departments and ministers following the commencement of Part 2 of the Right to Information and Integrity (Openness and Transparency) Amendment Act 2012 (PDF icon 342 KB) (the Amendment Act) are now in place.

The Act requires departments and ministers to include certain information in a disclosure log as soon as practicable after a valid access application is made, in particular, the details of the information being sought and the date the application was made valid.

If departments and ministers decide to give access to a document that does not contain personal information of the applicant, and the applicant accesses the document within the access period (40 business days), departments and ministers are required to also include in the disclosure log a copy of the document, the name of the applicant and if access to the document was sought for the benefit or use by an entity other than the applicant, the name of the other entity*.

If the applicant does not access the document within the access period, then the details of the document and information about the way in which the document may be accessed changes will be included in the disclosure log.

Our disclosure log will be maintained on the status of Right to Information access applications including:

  • departmental reference
  • the date the access application was made valid
  • a summary of the request for information.

After the documents have been accessed, the following will be provided:

  • the name of the applicant
  • a copy of the documents for release.

Once the applicant has accessed their documents, the applicant's name will be placed on the disclosure log and a copy of the documents, with the removal of any information that:

  • may be defamatory
  • its publication may be prevented by law
  • it is of a confidential nature communicated in confidence or protected from disclosure under a contract
  • it would, if included in a disclosure log, unreasonably invade an individual's privacy or cause substantial harm to an entity.

If you are experiencing difficulty accessing the department's documents for release, please email This email address is being protected from spambots. You need JavaScript enabled to view it. or contact (07) 3452 6949.

View archived applications here.

Loading table...
RTI reference Date of valid application Description of information Name of applicant / entity Status
RTIP1415-091 26 June 2015 All documents created between 1 July 2013 and 30 June 2015 with respect to suspected or reported hazards affecting the dwelling house situated at a nominated address at Runaway Bay, Queensland. Name withheld Application transferred to Gold Coast City Council
RTIP1415-089 10 June 2015 Documents produced since 1 March 2015 containing briefings, analysis, evaluation or assessments about:
  • projects ready to be constructed and/or commenced; and
  • approvals required and/or impediments or reasons for delaying commencement.
  Currently being processed
RTIP1415-087 15 June 2015 Correspondence to or from executive level public servants in Department of Natural Resources and Mines, excluding communication with third parties (ie only within government communications), in relation to proposed or approved high value agriculture land clearing on Strathmore Station (2 approvals), Olive Vale Station and the Galea approval (SDA-0314-009010). Executive level means DG,DDG, Directors or Executive Directors in this or the previous government. Details withheld Application transferred to Department of Infrastructure, Local Government and Planning
RTIP1415-086 27 May 2015 Documents created between 1 March 2008 and 1 March 2009 relating to the establishment, management and activities of the 'inter-departmental working group' established to address the future viability of Underground Coal Gasification in Queensland. The working group is referred to in a letter dated 15 April 2008 from Mr Dan Hunt, Department of Mines and Energy to Mr Ken Smith, Department of the Premier and Cabinet.   Currently being processed
RTIP1415-084 10 June 2015 All documents provided by the Department of Transport and Main Roads (DTMR) to the Department of State Development, Infrastructure and Planning (DSDIP) in the course of:
  • DSDIP's decision on SPD-1114-013485; and
  • communications between DSDIP and DTMR regarding Road Upgrade requirements on Development Approval MCU013-12/13.
Details withheld Application transferred to Department of Infrastructure, Local Government and Planning
RTIP1415-081 18 May 2015 Documents created between December 2008 and March 2009 relating to the 'high level steering group' established by the Coordinator General that is referenced in the letter dated 9 February 2009 from Premier Bligh to Mr David Maxwell, British Gas. Linc Energy Application finalised

Documents for release - RTIP1415-081 (PDF icon5.04 MB)
RTIP1415-078 7 May 2015 The following documents created between 1 January 2014 and 7 May 2015:
  • the Department's assessment of the bid for an Integrated Resort Development at Great Keppel Island;
  • the Department's assessment of other regional casino license bids;
  • documents revealing the Department's recommendations to Minister Seeney in relation to the original bids; and
  • documents revealing the Department's recommendations to Minister Lynham regarding the bid for an Integrated Resort Development at Great Keppel Island.
Tower Holdings Application finalised5
RTIP1415-075 10 April 2015 Documents created between July 2014 and April 2015 concerning grazing leases in Targinie District. Details withheld Application finalised1
RTIP1415-072 16 March 2015 All written communications referring to the document entitled 'Underground Coal Gasification Policy'. Linc Energy Application finalised

Documents for release - RTIP1415-072 (PDF icon 7.3 MB)
RTIP1415-070 2 March 2015 The draft Environmental Impact Statement for the Cairns Shipping Development Project. Details withheld Application refused1
RTIP1415-069 18 February 2015 All documents relating to a letter from Sanctuary Cove Community Matters Inc to the Attorney General. Sanctuary Cove Community Matters Inc. Application finalised2
RTIP1415-068 16 March 2015 Documents created between 1 January 2014 and 31 December 2014 relating to former Minister Jeff Seeney's claim in a media release that 28,000 jobs would be created by development of coal mines in the Galilee Basin. Details withheld Application finalised1
RTIP1415-066 4 February 2015 Grazing leases in Targinie District.

Date range: 1 January 2014 to 31 January 2015
Details withheld Application withdrawn
RTIP1415-065 23 January 2015 Documents created between 1 January 2014 and 23 January 2015 relating to the North Galilee Basin Rail Project and the acquisition of land. Landholder Services Pty Ltd Application finalised

Documents for release - RTIP1415-065 (PDF icon 143 MB)

RTIP1415-064 22 January 2015 All documents which form or are in support of applications to the Department of State Development, Infrastructure and Planning and/or the Coordinator-General, lodged by the Minister for Economic Development Queensland for development at Abbot Point.

Date range: 1 September 2014 to 20 January 2015
Details withheld Application withdrawn
RTIP1415-063 14 January 2015 Documents created between 1 August 2013 and 14 January 2015 concerning application of the Sunshine Coast Planning Scheme to Lot 3 on SP219490. Danseur Pty Ltd Application finalised

Documents for release - RTIP1415-063 (PDF icon 4.5 MB)
RTIP1415-061 8 January 2015 All documents relating to the application and approval of KRA (Key Resource Area) 158 Mount Walker / Scenic Rim Regional Council.

Date range: 1 January 2012 to 13 December 2013
Details withheld Application withdrawn
RTIP1415-060 19 December 2014 Documents relating to a Courier Mail article dated 15 December 2014 titled, "Home of Moreton Bay Mayor Allan Sutherland declared risk-free while neighbours in flood zone".

Date range: 1 July 2014 to 19 December 2014
Details withheld Application refused1
RTIP1415-058 18 December 2014 Documents created between 1 January 1998 and 18 December 2014 relating to the Peak Hill Quarry Lot 2 on RP 618088, Title Reference 30566223. Details withheld Application finalised

Documents for release - RTIP1415-058 (PDF icon 17.0 MB)
RTIP1415-057 15 December 2014 All documents relating to the proposed beneficial reuse, onshore placement, disposal and/or relocation of dredge spoil from Abbot Point on land.

Date range: 1 August 2014 to 15 December 2014
North Queensland Conservation Council Documents not accessed by applicant

To obtain a copy, please contact the Right to Information and Information Privacy team to arrange payment for access.

Processing charge: $1742.00
RTIP1415-056 15 December 2014 Documents created between 1 August 2014 and 15 December 2014 relating to the costs of the Queensland Government developing Abbot Point, specifically, work associated with projects referred to the Federal Government under the Environment Protection and Biodiversity Conservation Act 1999. North Queensland Conservation Council Application finalised

Documents for release - RTIP1415-056 (PDF icon 9.1 MB)
RTIP1415-055 12 December 2014 Documents relating to the state interest review of the Moreton Bay Regional Council draft 2014 Planning Scheme. Details withheld Application withdrawn
RTIP1415-054 12 December 2014 Documents relating to cost recovery or other funding arrangements for the infrastructure in, or associated with, the Abbot Point State Development Area. Details withheld Application refused1
RTIP1415-052 10 December 2014 Documents relating to and/or referring to Gold Coast Skyride Pty Ltd, Gold Coast Skyride, Neranwood Views Pty Ltd, Ruray Pty Ltd and/or Marylebone Pty Ltd. Details withheld Application withdrawn
RTIP1415-053 9 December 2014 All documents relating to the decision by the Queensland government to provide funding for, or investment in, the development of infrastructure for the Galilee Basin coal mines.

Date range: 1 January 2014 to 9 December 2014
Details withheld Application withdrawn
RTIP1415-051 9 December 2014 Documents regarding the sale and/or potential sale of any land associated with and/or used by the Brisbane Dental Hospital. Office of the Leader of the Opposition Documents not accessed by applicant

To obtain a copy, please contact the Right to Information and Information Privacy team to arrange payment for access.

Processing charge: $361.80

Access charges:
By CD: free
By paper copy: $21.75
RTIP1415-050 Min 5 December 2014 Correspondence between members of the Department and representatives of various banks regarding Queensland Coal Projects.

(This application was made to the Office of the Deputy Premier)
Details withheld Application refused1
RTIP1415-049 2 December 2014 The independent consultant assessments of the EOI proposal submitted by the ASF consortium as part of the Broadwater Marine Project (Gold Coast Cruise Ship Terminal) process as outlined by the Deputy Premier in parliament on 13 February 2014.

Date range: 1 October 2013 to 28 February 2014
Details withheld Application withdrawn
RTIP1415-048 2 December 2014 Documents showing any analysis, assessment, evaluation and/or details relating to the inclusion of a possible casino license as part of the Broadwater Marine Project. Details withheld Application withdrawn
RTIP1415-047 1 December 2014 Correspondence between members of the department and representatives of various banks regarding Queensland Coal Projects. Details withheld Application refused1
RTIP1415-046 21 November 2014 Cultural Heritage Progress Report #2 - Adani North Galilee Basin Rail project Juru Sector. Details withheld No documents located1
RTIP1415-045 Min 20 November 2014 All documents created or held by the Office of the Deputy Premier, Minister for State Development, Infrastructure and Planning, except cabinet documents, that relate to the decision to allow (or investigate) on land disposal of dredge spoil from dredging at Abbot Point.

(This application was made to the Office of the Deputy Premier)
Details withheld Application withdrawn
RTIP1415-044 20 November 2014 All documents created or held by the department, except cabinet documents, that relate to the decision to allow (or investigate) on land disposal of dredge spoil from dredging at Abbot Point. Details withheld Application withdrawn
RTIP1415-043 18 November 2014 The independent review (known as the Buningh report and dated 9 March 2014) into the potential trade and port development opportunities for the Port of Bundaberg commissioned by the Department of State Development, Infrastructure and Planning. Details withheld Application refused
RTIP1415-042 17 November 2014 All documents, studies and reports used to designate the site of KRA 83 as a key resource area (KRA). Ipswich City Council Application finalised

Documents for release - RTIP1415-042 (PDF icon 6.6 MB)
RTIP1415-041 17 November 2014 Extracts from the Fluoridation Project Closeout Reports that were created between 30 April 2012 and 13 November 2014 and which were submitted by the following Queensland Councils/Water Authorities:
  • Banana Shire Council;
  • Carpentaria Shire Council;
  • Central Highlands Regional Council;
  • Fraser Coast Regional Council;
  • Goondiwindi Regional Council;
  • Gympie Regional Council;
  • Mackay Regional Council;
  • North Burnett Regional Council;
  • South Burnett Regional Council;
  • Southern Downs Regional Council;
  • Toowoomba Regional Council;
  • Western Downs Regional Council; and
  • Longreach Regional Council.
Fluoride Action Network Australia Inc. Application finalised

Documents for release - RTIP1415-041 (PDF icon 7.3 MB)
RTIP1415-040 11 November 2014 All documents relating to the Lease and Rent Reviews for the premises situated at 240 MacArthur Avenue Eagle Farm. Details withheld Application withdrawn
RTIP1415-039 10 November 2014 Documents relating to the upgrading of marine facilities at Mission Beach. Details withheld Application refused
RTIP1415-038 31 October 2014 Documents relating to the Etheridge Integrated Agricultural Project. The Wilderness Society Application finalised

Documents for release - RTIP1415-038 (PDF icon 33.5 MB)
RTIP1415-035 Min 15 October 2014 All material that the Minister had before him when he made the Cape York Regional Plan on 8 August 2014, as notified in the Queensland Government Gazette dated 15 August 2014 pursuant to section 64(1)(a) of the Sustainable Planning Act 2009.

(This application was made to the Office of the Deputy Premier)
Details withheld Application finalised1
RTIP1415-034 Min 15 October 2014 All material that the Minister had before him when he decided to endorse an Executive Council minute for the draft Regional Planning Interests Regulation that was later made by the Governor in Council on 13 June 2014.

(This application was made to the Office of the Deputy Premier)
Details withheld Application finalised1
RTIP1415-033 15 October 2014 All material that the Minister had before him when he made the Cape York Regional Plan on 8 August 2014, as notified in the Queensland Government Gazette dated 15 August 2014 pursuant to section 64(1)(a) of the Sustainable Planning Act 2009. Cape York Land Council Documents not accessed by applicant.

To obtain a copy, please contact the Right to Information and Information Privacy team to arrange payment for access.

Processing charge: $341.70

Access charges:
By CD: free
By paper copy: $27.50
RTIP1415-032 15 October 2014 All material that the Minister had before him when he decided to endorse an Executive Council minute for the draft Regional Planning Interests Regulation that was later made by the Governor in Council on 13 June 2014. Cape York Land Council Application finalised

Documents for release - RTIP1415-032 (PDF icon 8.8 MB)
RTIP1415-028 26 September 2014 Communications to the Regional and Central based department offices seeking updates or additional components added to the on-line MyDas development application system. Details withheld Application Withdrawn
RTIP1415-027 Min 22 September 2014 All documents about or concerning the following meetings with the Deputy Premier:
  1. 'Coordinator General' on 2 July 2014;
  2. 'Mr Gautam Adani' on 15 July 2014;
  3. 'DSDIP staff' regarding 'Galilee Basin' on 17 July 2014; and
  4. Peter Milton, North Queensland Bulk Ports on 31 July 2014.
(This application was made to the Office of the Deputy Premier)
Group Coal Pty Ltd Application finalised

Documents for release - RTIP1415-027 (PDF icon 86.7 KB)
RTIP1415-026 22 September 2014 Documents regarding the sale and/or potential sale of any land associated with and/or used by the Brisbane Dental Hospital. Details withheld Application withdrawn
RTIP1415-025 19 September 2014 All valuation reports prepared on Coorparoo Junction (264-300 Old Cleveland Road, 12-26 Holdsworth Street and 161 Cavendish Road), including internal and external reports. Details withheld Access refused1
RTIP1415-023 8 September 2014 Documents which pertain to a Habitat Protection Overlay at a property. Details withheld No documents located1
RTIP1415-022 1 September 2014 Documents relating to the development of the Gold Coast Aquatic Centre since 29 March 2012, which mention the absence of a roof. Seven Network Application finalised

Documents for release - RTIP1415-022 (PDF icon 20 MB)
RTIP1415-021 29 August 2014 Documents containing information about a draft Sunshine Coast planning scheme on Lot 2 RP841494. Australian Broadcasting Corporation Application finalised

Documents for release - RTIP1415-021 (PDF icon 9.3 MB)
RTIP1415-020 28 August 2014 Information showing costings and/or analysis and/or consideration of the relative benefits to the local and/or broader indigenous community from the:
  • Glencore proposal to mine bauxite near Aurukun;
  • Australian Indigenous Resources proposal to mine bauxite near Aurukun; and
  • Aurukun Bauxite Development proposal to mine bauxite near Aurukun.
Details withheld Application withdrawn
RTIP1415-019 26 August 2014 Credit card statements and receipts created between 26 March 2012 and 26 August 2014 relating to the Director-General's expenses. Seven Network Application finalised

Documents for release - RTIP1415-019 (PDF icon 27 MB)
RTIP1415-018 Min 26 August 2014 Any documents about or concerning:
  1. Hedley Thomas (or any other representative of The Australian); or
  2. Any discussion or directions regarding the Queensland Nickel tailings dam at Yabulu.
Date range: 28 May 2014 to 26 August 2014

(This application was made to the Office of the Deputy Premier)
Details withheld No documents located1
RTIP1415-008 26 August 2014 All documents (including all metadata about the documents) about or concerning the email sent by the Office of the Coordinator-General to Waratah Coal Pty Ltd on 26 November 2013.

Date range: 26 November 2013 to 27 December 2013
Withheld Access refused
RTIP1415-017 Min 25 August 2014
  1. Any discussions or meetings with Hedley Thomas (or any other representative of The Australian); or
  2. Any discussions or directions regarding the Queensland Nickel tailings dam at Yabulu.
Date range: 14 June 2014 to 24 June 2014

(This application was made to the Office of the Deputy Premier)
Details withheld Application withdrawn
RTIP1415-016 Min 25 August 2014 Any documents about or concerning statements drafted for or made by the Deputy Premier regarding Clive Frederick Palmer.

Date range: 31 May 2014 to 15 June 2014

(This application was made to the Office of the Deputy Premier)
Details withheld Access refused
RTIP1415-015 19 August 2014 The independent review (known as the Buningh report and dated 9 March 2014) into the potential trade and port development opportunities for the Port of Bundaberg commissioned by the Department of State Development, Infrastructure and Planning.

Date range: 1 March 2014 to 31 March 2014
Details withheld Application refused
RTIP1415-014 15 August 2014 Copies of all communications with regard to:
  • Old Coach Road, Reedy Creek, 4228
  • Old Coach Road, Tallebudgera Valley, 4228
  • Old Coach Road Connector, Reedy Creek, 4228
  • Bermuda Street Extension, Reedy Creek, 4228
  • Lot 105, SP144215 Lot 176, RP899491.
Date range: 1 January 1999 to 30 July 2014
Details withheld Access refused
RTIP1415-013 15 August 2014 Documents relating to the development permit for Groundwork Plus (on behalf of the Barro Group Pty Limited) approved on 20 December 2013. Details withheld Access refused
RTIP1415-012 15 August 2014 Documents relating to developments called in by the Minister from October 2013 to 15 August 2014. Details withheld Access refused
RTIP1415-009 7 August 2014 Documents passing between the Coordinator General, Department of Transport and Main Roads and Cardno HP concerning:
  • the Bermuda Street Extension (also known as the Old Coach Road Connector); and
  • Boral Resources (Qld) Pty Ltd application for significant project status as notified in Gazette No. 83 Gold Coast Quarry
Hammercall Pty Ltd Application finalised

Documents for release - RTIP1415-009 (PDF icon 36 MB)
RTIP1415-006 Min 29 July 2014 Any documents about or concerning:
  1. any discussions or meetings with Hedley Thomas (or other representative of 'The Australian'); or
  2. any discussions or directions regarding the Queensland Nickel tailings dam at Yabulu.
Date range: 25 June 2014 to 29 July 2014

(This application was made to the Office of the Deputy Premier)
Details withheld No documents located1
RTIP1415-005 22 July 2014 The tender evaluation scores for all 13 tender applications for the Gold Coast Hospital demolition project.

Date range: 1 March 2014 to July 2014
Details withheld Application withdrawn
RTIP1415-004 18 July 2014 List of all 13 prices tendered on the Gold Coast Hospital Project.

Date range: 1 March 2014 to 18 July 2014
Details withheld Documents for release - RTIP1415-004 (PDF icon 4 MB)
RTIP1415-002 14 July 2014
  1. All meta-data about or concerning the letter from Barry Broe to Waratah Coal dated 26 November 2013; and
  2. All meta-data about or concerning the statement of reasons which was enclosed in the letter from Barry Broe to Waratah Coal dated 26 November 2013; and
  3. All meta-data about or concerning cancellation of the declared Galilee Coal Project as a coordinated project.
Date range: 18 November 2013 to 6 December 2013
Details withheld Access refused
RTIP1415-001 2 July 2014 Documents held by any section of DSDIP that is involved with fluoridation in any way, particularly the Qld Fluoridation Capital Assistance team and the Queensland Water Fluoridation Implementation Program team. Fluoride Action Network Australia Inc. Application finalised5
RTIP1314-136 Min 27 June 2014 Any documents about or concerning statements drafted for (whether used or not), or made by, the Deputy Premier regarding Clive Frederick Palmer.

Date range: 31 May 2014 to 15 June 2014

(This application was made to the Office of the Deputy Premier)
Details withheld Access refused
RTIP1314-140 Min 26 June 2014 All details of expenditure of the Office of the Deputy Premier, including all travel, cars, petty cash receipts, cab charge, food office supplies, staff gatherings and all other related expenditure.

Date range: 1 January 2014 to 26 June 2014

(This application was made to the Office of the Deputy Premier)
Details withheld Withdrawn
RTIP1314-139 25 June 2014
  1. All documents and correspondence about or concerning the letter from Barry Broe to Waratah Coal dated 26 November 2013; and
  2. All documents and correspondence about or concerning the statement of reasons which was enclosed in the letter from Barry Broe to Waratah Coal dated 26 November 2013; and
  3. All documents and correspondence about or concerning cancellation of the declared Galilee Coal Project as a coordinated project.
Date range: 2 April 2014 to 25 June 2014
Waratah Coal Pty Ltd Application finalised

Documents for release - RTIP1314-139 (PDF icon 1.5 MB)
RTIP1314-138 25 June 2014 All documents relating to the Director-General's expenses relating to hospitality and entertainment with elected officials and/or stakeholders/business representatives.

Date range: 26 March 2012 to 25 June 2014
Alison Sandy / Seven Network Documents for release - RTIP1314-138 (PDF icon 54 MB)
RTIP1314-137 Min 24 June 2014 Any documents or correspondence about or concerning:
  1. any discussions or meetings with Hedley Thomas; or
  2. any discussions or directions regarding the Queensland Nickel tailings dam at Yabulu.
Date range: 14 June 2014 to 24 June 2014

(This application was made to the Office of the Deputy Premier)
Details withheld Access refused
RTIP1314-135 20 June 2014 Documents created between 1 July 2013 and 20 June 2014 concerning the Windfarm code and planning guidelines, and the Call In of the Mt Emerald Wind Farm. Details withheld Application finalised

Documents for release - RTIP1314-135 (part 1) (PDF icon 55 MB)

Documents for release - RTIP1314-135 (part 2) (PDF icon 13 MB)
RTIP1314-132 Min 13 June 2014 Any documents or correspondence about or concerning: 1) any discussions or meetings with Hedley Thomas, or 2) any discussions or directions regarding the Queensland Nickel tailings dam at Yabulu.

Date range: 28 May 2014 to 13 June 2014

(This application was made to the Office of the Deputy Premier)
Details withheld Access refused
RTIP1314-130 10 June 2014 Information relating to Karreman Quarries Details withheld Application withdrawn
RTIP1314-128 29 May 2014 All documents about or concerning the matters referred to in the letter (DEHP reference number 027-2014), from the Department of Environment and Heritage Protection to Queensland Nickel Pty Ltd dated 16 May 2014.

Date range: 1 January 2014 to 29 May 2014
Details withheld No documents located1
RTIP1314-127 Min 29 May 2014 Any documents or correspondence about or concerning 1) any discussions or meetings with Hedley Thomas, or 2) any discussions or directions regarding the Queensland Nickel tailings dam at Yabulu.

Date range: 15 May 2014 to 27 May 2014

(This application was made to the Office of the Deputy Premier)
Details withheld No documents located1
RTIP1314-126 Min 27 May 2014 All documents about or concerning the matters referred to in the letter (DEHP reference number 027-2014), from the Department of Environment and Heritage Protection to Queensland Nickel Pty Ltd dated 16 May 2014.

Date range: 1 January 2014 to 29 May 2014

(This application was made to the Office of the Deputy Premier)
Details withheld No documents located1
RTIP1314-124 22 May 2014 Any response(s) received by the Office of the Coordinator-General to the letter from Assistant Coordinator-General, to GVK/Hancock Coal, dated 30 July 2013.

Date range: 30 July 2013 to 31 October 2013
Details withheld No documents located1
RTIP1314-123 13 May 2014 Documents relating to the Erin View Key Resource Area KRA 140. Shamrockvale Pty Ltd Application finalised

Documents for release - RTIP1314-123(part 1) (PDF icon 19.1 MB)

Documents for release - RTIP1314-123 (part 2) (PDF icon 14.3 MB)
RTIP1314-122 14 May 2014 Any documents or correspondence about or concerning:
  1. any discussions or meetings with Hedley Thomas; or
  2. any discussions or directions regarding the Queensland Nickel tailings dam at Yabulu.
Date range: 29 April 2014 to 14 May 2014

(This application was made to the Office of the Deputy Premier)
Details withheld No documents located1
RTIP1314-120 7 May 2014 A brief prepared by a consultant engaged by the State Government in 2007 addressing options to develop the existing Whitsunday Coast Airport (WCA) at Proserpine versus expanding the Laguna Quays Airport (LQA). Cairns Airport Pty Ltd Application finalised4

Documents subject to copyright, please contact the Right to Information and Information Privacy team to arrange access.
RTIP1314-119 7 May 2014 All emails between the Deputy Premier's chief of staff and the Gold Coast Mayor's chief of staff, covering the period which both the government and the council had a memorandum of understanding regarding the Broadwater Marine Project.

Date range: 1 November 2012 to 7 May 2014.

(This application was made to the Office of the Deputy Premier)
Paul Weston / Gold Coast Bulletin Application finalised

Documents for release - RTIP1314-119 (PDF icon 126 KB)
RTIP1314-111 28 April 2014 Any documents or correspondence about or concerning:
  1. any discussions or meetings with Hedley Thomas; or
  2. any discussions or directions regarding the Queensland Nickel tailings dam at Yabulu.
Date range: 25 April 2014 to 28 April 2014
Queensland Nickel Pty Ltd No documents located1
RTIP1314-110 24 April 2014 Any documents or correspondence about or concerning:
  1. any discussions or meetings with Hedley Thomas; or
  2. any discussions or directions regarding the Queensland Nickel tailings dam at Yabulu.
Date range: 24 April 2014
Queensland Nickel Pty Ltd No documents located1
RTIP1314-109 23 April 2014 Any documents or correspondence about or concerning:
  1. any discussions or meetings with Hedley Thomas; or
  2. any discussions or directions regarding the Queensland Nickel tailings dam at Yabulu.
Date range: 23 April 2014
Queensland Nickel Pty Ltd No documents located1
RTIP1314-108 22 April 2014 Any documents or correspondence about or concerning:
  1. any discussions or meetings with Hedley Thomas; or
  2. any discussions or directions regarding the Queensland Nickel tailings dam at Yabulu.
Date range: 18 April 2014 to 22 April 2014
Queensland Nickel Pty Ltd No documents located1
RTIP1314-096 17 April 2014 Any documents or correspondence about or concerning:
  1. any discussions or meetings with Hedley Thomas; or
  2. any discussions or directions regarding the Queensland Nickel tailings dam at Yabulu.
Date range: 17 April 2014

(This application was made to the Office of the Deputy Premier)
Queensland Nickel Pty Ltd No documents located1
RTIP1314-095 16 April 2014 Any documents or correspondence about or concerning:
  1. any discussions or meetings with Hedley Thomas; or
  2. any discussions or directions regarding the Queensland Nickel tailings dam at Yabulu.
Date range: 16 April 2014

(This application was made to the Office of the Deputy Premier)
Queensland Nickel Pty Ltd No documents located1
RTIP1314-094 15 April 2014 Any documents or correspondence about or concerning:
  1. any discussions or meetings with Hedley Thomas; or
  2. any discussions or directions regarding the Queensland Nickel tailings dam at Yabulu.
Date range: 25 March 2014 to 15 April 2014

(This application was made to the Office of the Deputy Premier)
Queensland Nickel Pty Ltd No documents located1
RTIP1314-093 11 April 2014 The complete file of the proposed transfer of a Spring Hill property from Queensland Health to the Department of Education, Training and Employment.

Date range: 18 November 2013 to 11 April 2014
Brisbane Central State School Parents & Citizens Association Application finalised

Documents for release - RTIP1314-093 (PDF icon 6.1 MB)
RTIP1314-092 11 April 2014
  1. All documents and correspondence about or concerning the letter from Barry Broe to Waratah Coal Pty Ltd dated 26 November 2013;
  2. All documents and correspondence about or concerning the statement of reasons which was enclosed in the letter from Barry Broe to Waratah Coal Pty Ltd dated 26 November 2013; and
  3. All documents and correspondence about or concerning cancellation of the declared Galilee Coal Project as a coordinated project.
Date range: 21 October 2013 to 1 April 2014
Waratah Coal Pty Ltd Application finalised

Documents for release - RTIP1314-092 (PDF icon 43.3 MB)
RTIP1314-090 27 March 2014 Documents relating to land based disposal of dredge material from dredging conducted at the Port of Abbot Point. Details withheld No documents located1
RTIP1314-085 12 March 2014 Documents relating to a Development Application at Coolum Beach. Details withheld Application finalised

Documents for release - RTIP1314-085 (PDF icon 2.9 MB)
RTIP1314-082 25 February 2014 All documents relating to meetings and/or correspondence involving Eddie Obeid Jnr and/or Nick di Girolamo. Details withheld No documents located1
RTIP1314-080 10 February 2014 The Energy Efficiency Ratings Certificate for a property. Details withheld Application finalised

Documents for release - RTIP1314-080 (PDF icon 1.8 MB)
RTIP1314-077 20 January 2014 All documents between the Department(s) for Local Government, Infrastructure and Planning and Natural Resources (Mines DERM), (name withheld), Kolan Shire Council, Bundaberg Regional Council and any other third parties.

Date range: January 1996 to January 2014
Details withheld Application finalised1
RTIP1314-071 7 January 2014 All documents about or concerning either:
  • The letter of 14 January 2013 from Deputy Premier Seeney to Mr Palmer;
  • The document titled 'Galilee Basin Coal Infrastructure Framework;
  • The document titled 'Galilee Basin Development Strategy.
Waratah Coal Pty Ltd Application finalised

Documents for release - RTIP1314-071 (PDF icon 53.7 MB)
RTIP1314-069 7 January 2014 Documents concerning GVK-Hancock's proposed narrow-gauge railway from the Galilee Basin to the Port of Abbot Point, including its connection to Aurizon Holdings Ltd's (Aurizon) existing narrow-gauge railway, as announced on 25 November 2013 by Aurizon to the Australian Securities Exchange. Waratah Coal Pty Ltd Application finalised

Documents for release – RTIP1314-069 (PDF icon 11.7 MB)
RTIP1314-074 20 December 2013 The Memorandum of Understanding between the Queensland Government and the Gold Coast City Council for the Broadwater Marine Project. Natalie Wain Application finalised

Documents for release – RTIP1314-074 (PDF icon 3.4 MB)
RTIP1314-072 17 December 2013 Documents produced since the election of the Newman Government containing any information about incidents or occasions of harassment and/or bullying and/or abusive behaviour, including swearing, involving the minister and/or ministerial staff and/or any other minister in contact with the office.

(This application was made to the Office of the Deputy Premier)

Details withheld

Application finalised1
RTIP1314-070 10 December 2013 All draft versions of the statement of reasons (including all relevant working papers) issued by the Governor in Council on 31 October 2013 refusing Waratah Coal Pty Ltd's infrastructure facility of significance application filed on 1 July 2011. Details withheld Application Withdrawn
RTIP1314-066 18 November 2013 Complete file of the proposed transfer of a property (Lot 1 on Crown Plan SL841384) from Queensland Health to Department of Education, Training and Employment at Spring Hill. Brisbane Central State School Parents & Citizens Association Application finalised

Documents for release - RTIP1314-066 (PDF icon 16.1 MB)
RTIP1314-055 13 November 2013 Documents evidencing communication or correspondence between DSDIP and the Industry Consultative Committee established under the Underground Coal Gasification (UCG) Policy 2009. Details withheld Application Withdrawn
RTIP1314-054 13 November 2013 Documents evidencing communication or correspondence relating to Under Ground Coal Gasification (UCG). Linc Energy Application finalised

Documents for release - RTIP1314-054 (PDF icon 2.6 MB)
RTIP1314-044 8 November 2013 Documents relating to various transmission line and network projects for a property. Creevey Russell Lawyers Application finalised

Documents for release - RTIP1314-044 (PDF icon 31.5 MB)
RTIP1314-043 7 November 2013 All documents and correspondence about or concerning Waratah Coal Infrastructure Facility of Significance application.

(This application was made to the Office of the Deputy Premier)
Details withheld Application finalised1
RTIP1314-042 7 November 2013 All Documents and correspondence concerning the Waratah Coal Infrastructure Facility of Significance application. Waratah Coal Pty Ltd Application finalised

Documents for release - RTIP1314-042 (PDF icon 6.5 MB)
RTIP1314-041 6 November 2013 All documents and correspondence about or concerning either The Environmental Protection Order issued by the Department of Environment to Waratah Coal.

(This application was made to the Office of the Deputy Premier)
Mineralogy Pty Ltd Application finalised

Documents for release - RTIP1314-041 (PDF icon 292 KB)
RTIP1314-040 6 November 2013 All documents and correspondence about or concerning either The Environmental Protection Order issued by the Department of Environment to Waratah Coal. Details withheld No documents located1
RTIP1314-038 29 October 2013 Documents relating to proposed call-in notice for a development application on RP89286 under the Sustainable Planning Act 2009. Ace Waste Pty Ltd Application finalised

Documents for release - RTIP1314-038 (PDF icon 3.9 MB)
RTIP1314-037 29 November 2013 All documents that show the basis upon which the Coordinator-General has been asked to make declarations and/or the basis upon which declarations have been made in relation to the APLNG project. Details withheld No documents located1
RTIP1314-034 22 October 2013 Documents provided by Brisbane City Council to the Planning division to support the change of the proposed Low Density Residential zone of a property to Environmental Protection as part of the Lower Oxley Creek South Neighbourhood Plan. Details withheld Application finalised

Documents for release - RTIP1314-034 (PDF icon 83.5 MB)
RTIP1314-033 16 October 2013 All correspondence passing between DERM and DSDIP in relation to the Noosa on Weyba Biodiversity Development Offset Area.

Date range: 1 January 2010 to 29 February 2012
Helen Cooper Application finalised

Documents for release - RTIP1314-033 (PDF icon 5.2 MB)
RTIP1314-032 16 October 2013 DEEDI (Fisheries Queensland) submission to the CG in response to the Gladstone Ports Corporation Supplementary Information Document in relation to the Western Basin Dredging Disposal Project. Shine Lawyer Application finalised

Documents for release - RTIP1314-032 (PDF icon 1.6 MB)
RTIP1314-030 14 October 2013 Information held regarding the proposed activities authorised under the Petroleum and Gas (Production and Safety) Act 2004 in relation to a property. Details withheld Application withdrawn
RTIP1314-029 9 October 2013 The assessment and decision on High Flood Immunity Access - Belyando Estate Moranbah and Winfields Road Landfill Upgrade Funding Application.

Date range: 1 November 2012 to 9 October 2013
Isaac Regional Council Application finalised

Documents for release – Folio A - RTIP1314-029 (PDF icon 21.6 MB)

Documents for release – Folio B - RTIP1314-029 (PDF icon 3.2 MB)

Documents for release – Folio C - RTIP1314-029 (PDF icon 6 MB)

Documents for release – Deferred Access - RTIP1314-029 (PDF icon 24.2 MB)
RTIP1314-027 2 October 2013 Documents relating to the purchase and sale of Horizontal Directional Drilling (HDD) Pipes used in the Western Corridor project - Eastern Pipeline Alliance project. Details withheld No documents located1
RTIP1314-025 20 September 2013 All communications and presentations regarding the Gold Coast Quarry.

Date range: 1 January 2006 to 4 July 2013
Anthony Davis Application finalised

Documents for release - RTIP1314-025 (PDF icon 123 MB)

Deferred Access Documents for release - RTIP1314-025 (PDF icon 162 MB)

External Review Documents for release - RTIP1314-025 (PDF icon 10 MB)
RTIP1314-024 12 September 2013 Documents relating to the impact of the Northern Pipeline Interconnector to Lot 5 on SP135553. Butler McDermott Lawyers Application finalised

Documents for release - RTIP1314-024 (PDF icon 10.9 MB)
RTIP1314-023 6 September 2013 Information relating to future plans for the Gold Coast Hospital site in Southport. Details withheld Application withdrawn
RTIP1314-022 4 September 2013 Details of any development or subdivision applications and related matters relating to Lot 15 on Survey Plan 195994, Title Reference 50639293. Details withheld No documents located1
RTIP1314-019 29 August 2013 Documents relating to discussions undertaken by Minister Seeney and/or officials with personnel representing Springsure Creek Coal Pty Ltd. Details withheld Application finalised

Documents for release - RTIP1314-019 (PDF icon 2.1 MB)
RTIP1314-013 23 August 2013 Documents attached to RTI documents 94 and 98 of the access application to DPC RTID181. Waratah Coal Pty Ltd Application finalised

Documents for release – RTIP1314-013 (PDF icon 3 MB)
RTIP1314-012 21 August 2013 All correspondence between New Zealand's State Services Commission and the former Department of Employment, Economic Development and Innovation (DEEDI) regarding Mr Fletcher's employment (former DEEDI CEO). Details withheld Application Withdrawn
RTIP1314-009 6 August 2013 Documents relating to the Abbot Point Coal Terminal. King & Wood Mallesons / John Holland Pty Ltd Application finalised

Documents for release - RTIP1314-009 (PDF icon 1.6 MB)
RTIP1314-008 25 July 2013 The background facts and materials that the Minister received and relied on in relation to the acquisition price of $50 million for the Coorparoo Myer site as stated in the Media Release "Coorparoo Junction facelift a step closer" dated 17 July 2013. Pembly Pty Ltd Application finalised

Documents for release - RTIP1314-008 (PDF icon 2.9 MB)

Documents for release - Internal review - RTIP1314-008 (PDF icon 4.8 MB)
RTIP1314-003 12 July 2013 Any documents relating to politician pay rise, or changes to MP remuneration and entitlements.

(This application was made to the Office of the Deputy Premier)
The Courier Mail Application finalised

Documents for release - RTIP1314-003 (PDF icon 20.2 MB)
RTIP1314-001 4 July 2013 Documents relating to the Gold Coast Quarry Project. Details withheld Application finalised

Documents for release - RTIP1314-001 (PDF icon 7.9 MB)
RTI149 13 June 2013 Correspondence regarding Temporary Local Planning Instrument (TLPI) 01/13 passing between Brisbane City Council and the Department or Minister. Dibbs Barker Lawyers/Quintenon Pty Ltd Application finalised

Documents for release - RTI149 (PDF icon 8.6 MB)
RTI148 14 June 2013 Documents containing a list of all land and buildings held by the State of Queensland available or possibly for sale since the last election. Seven Network Limited Application finalised

Documents for release - RTI148 (PDF icon 121 KB)
RTI146 5 June 2013 Documents relating to the Civil Aviation Safety Authority concerning the Curtis Island LNG project (GLNG, APLNG, QCLNG, Arrow), particularly a gas plume. The Courier Mail Application finalised

Documents for release - RTI146 (PDF icon 210 MB)
RTI144 5 June 2013 Documents relating to the determination of the compensation amount for a property resumed under the Northern Pipeline Interconnector Stage 2 Project. Details withheld Application refused1
RTI143 28 May 2013 Any correspondence and briefing notes regarding correspondence between the Department, the Office of the Deputy Premier and Anglo American or Anglo American Australia in relation to release of mine water into the Callide Dam. Tim Mulherin / Office of the Leader or the Opposition Application finalised

Documents for release - RTI143 (PDF icon 1.1 MB)
RTI142 28 May 2013 Any correspondence and briefing notes regarding correspondence between the Department, Office of the Deputy Premier and Anglo American in relation to release of mine water into the Callide Dam. Details withheld No documents located1
RTI141 27 May 2013 Draft and final studies/reports/assessments associated with the Aurukun Bauxite Mine and Port Development Environmental Impact Statement (EIS). Details withheld Application Withdrawn
RTI140 23 May 2013 Correspondence between the Department and any Queensland Council and Queensland Water Directorate regarding provision/reimbursement of funding for water fluoridation programs. Fluoride Action Network Australia Inc Application finalised

Documents for release - RTI140 (PDF icon 57.9 MB)
RTI136 13 May 2013 All documents in relation to the Deputy Premier's decision on 24 April 2013 to approve, subject to conditions, a development application made by Stockland (North Lakes) Pty Ltd for a Costco development. Details withheld Application Withdrawn
RTI135 13 May 2013 All documents listed in the Deputy Premier's Call In Notice dated 20 December 2012 as being documents to which the Deputy Premier had regard in forming his decision to call in a development application made by Stockland (North Lakes) Pty Ltd for a Costco Development. Details withheld Application Withdrawn
RTI134 13 May 2013 All documents in relation to meetings held between the Department's Chief Executive, Deputy Premier or other staff and representatives from Stockland/Costco. Details withheld Application Withdrawn
RTI132 10 May 2013 All correspondence and communications between the Department of State Development, Infrastructure and Planning and the Office of the Information Commissioner. Waratah Coal Pty Ltd Application finalised

Documents for release - Folio 1 - RTI132 (PDF icon 12.2 MB)

Documents for release - Folio 2 - RTI132 (PDF icon 7.3 MB)

Documents for release - Folio 3 - RTI132 (PDF icon 18 KB)
RTI131 10 May 2013 Documentation relating to the Economic Development Bill 2012. Waratah Coal Pty Ltd Application finalised1
RTI130 10 May 2013 All documents regarding the development of the Port of Abbot Point held with the Department of State Development, Infrastructure and Planning. Waratah Coal Pty Ltd Application finalised

Documents for release - RTI130 (PDF icon 23.6 MB)
RTI129 9 May 2013 All documents regarding the development of the Port of Abbot Point held with the Office of the Coordinator-General. Waratah Coal Pty Ltd Application finalised

Documents for release - Folio One RTI129 (PDF icon 12.4 MB)

Documents for release - Folio Two RTI129 (PDF icon 15.8 MB)
RTI128 9 May 2013 All documents regarding the development of the Port of Abbot Point.

(This application was made to the Office of the Deputy Premier)
Waratah Coal Pty Ltd Application finalised

Documents for release - RTI128 (PDF icon 372 KB)
RTI127 3 May 2013 Bowen and Abbot Point Industrial Land Concept Plan and Infrastructure Plan: The Demand for Industrial Land report. McCullough Robertson Lawyers Application finalised4
RTI126 2 May 2013 The Diary of the Chief Of Staff to The Deputy Premier and Minister For State Development, Infrastructure and Planning.

Date range: 1 January 2013 to and including 31 March 2013

(This application was made to the Office of the Deputy Premier)
Details withheld Application Withdrawn
RTI122 23 April 2013 All Ministerial Briefing Notes identified as urgent or requiring some action or detailing reports, between the Director-General and Minister for State Development, Infrastructure and Planning.

Date range: 1 January 2013 and 23 April 2013
The Courier Mail Application finalised

Documents for release - RTI122 (PDF icon 52.2 MB)
RTI117 3 April 2013 All briefing notes that have been prepared for the Deputy Premier, Minister for State Development, Infrastructure and Planning.

Date range: 25 February 2013 to 1 April 2013
Name withheld Application withdrawn
RTI116 21 March 2013 Documents relating to the sale of a property. Details withheld Application finalised

Documents for release - RTI116 (PDF icon 201 KB)
RTI115 14 March 2013 Diary of the Deputy Premier, Minister for State Development, Infrastructure and Planning for the period 1 January 2013 to 31 January 2013. Tim Mulherin / Office of the Leader of the Opposition Application finalised

Deputy Premier Diary - January 2013 (PDF icon 4.8 MB)
RTI111 4 March 2013 Third party independent audits of compliance as detailed under Part 6, condition 30 of the Western Basin Dredging and Disposal Project. Australian for Animals Inc Application finalised

Documents for release - RTI111 (PDF icon 15.3 MB)
RTI110 1 March 2013 All communications between Transport and Main Roads Director-General, Michael Caltabiano's Office and the Deputy Premier, Jeff Seeney held by the Office of the Deputy Premier.

(This application was made to the Office of the Deputy Premier)
Waratah Coal Pty Ltd Application finalised

Deputy Premier - Meeting Request (PDF icon 22 KB)
RTI109 1 March 2013 All communications between Transport and Main Roads Director-General, Michael Caltabiano and the Department of State Development, Infrastructure and Planning, relating to the Premier, Campbell Newman. Waratah Coal Pty Ltd Application finalised

Documents for release - RTI109 (PDF icon 924 KB)
RTI108 1 March 2013 All correspondence to or from or in relation to a consulting firm held in the Office of the Deputy Premier. Waratah Coal Pty Ltd Application finalised

Documents for release - RTI108 (PDF icon 7.9 MB)
RTI104 27 February 2013 Documents relating to wind farms and proposed wind farms in Queensland. Details withheld Application finalised

Documents for release - RTI104 (PDF icon 30.4 MB)

Internal Review Documents for release - RTI104 (PDF icon 22.5 MB)
RTI103 26 February 2013 All documents relating to engineering and stormwater design of the Western Residential precinct of Royal Pines. Details withheld Application Withdrawn

Where the released documents are not attached to the relevant entry, the below information will help you identify the department's reason for not including the documents:

  1. No documents released, or pages would be blank after the removal of personal information.
  2. Documents not published due to privacy or confidentiality considerations.
  3. Documents contain information that could be defamatory.
  4. Documents not published due to copyright or contractual considerations, or prevents by law.
  5. Publication of documents may cause substantial harm to an entity.

If you have any questions about the disclosure log, please contact the Right to Information team.